• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Ethical Design Co.

Ethical Design Co.

A print and digital design agency that cares.

  • About
    • Team
    • Our ethos
  • Case studies
  • Services
    • Sustainability report design
    • Annual report design
    • Presentation & PowerPoint design
    • Website design & development
    • Branding & logo design
    • Infographics & data visualisation
    • Dashboard design & Power BI design
    • Green printing
  • Articles
  • Contact
  • Facebook
  • Instagram
  • LinkedIn

KERAMIDA

Featured image on the KERAMIDA case study page - Multiple pages from the Lamons Sustainability Report 2022, highlighting sustainability strategies and renewable energy initiatives, designed by Ethical Design Co.

October 21, 2023 By Caitlin Jordan

KERAMIDA Inc. is a Global Sustainability & EHS Services Firm and WBENC-Certified Woman-Owned Business with offices based across the United States.

KERAMIDA is a prominent environmental, health, and safety consulting firm dedicated to providing innovative and sustainable solutions to clients across various industries and sectors worldwide. Established in 1988, KERAMIDA has built a reputation for excellence in environmental engineering and consulting, sustainability, and compliance services. With a team of experienced professionals, the company specialises in helping organisations navigate complex regulatory landscapes, manage environmental risks, and develop strategies to enhance their overall sustainability profile.

←TAL Apparel
Space Capital→
Data visualisation
Icon design
Infographic design
Report design
Secondary branding
Tablet mockup of the City of Evansville Climate Action Plan 2025 cover design, featuring a photo of the riverfront at sunset with a blue and yellow angled graphic overlay and sector icons.
City of Evansville Climate Action Plan 2025, featuring an introduction photo of a red bridge and data visualisations (charts and graphs) highlighting local climate change impacts and community vulnerability.
City of Evansville Climate Action Plan 2025 – four inside pages featuring strategy tables, emissions data visualisations and sector highlights on transportation, land use, waste and climate resilience.
City of Evansville Climate Action Plan 2025 – Energy sector section break featuring rooftop solar panels on a green patterned background of building icons.
City of Evansville Climate Action Plan 2025 – Transportation strategy full-page table outlining actions, timelines, costs, and emissions impacts on a yellow background with bus icons.
City of Evansville Climate Action Plan 2025 – full-page design for the Waste sector with a donut chart visualising emissions from solid waste and wastewater, on a blue background with bin icons.
Naperville 2030 Carbon Action Plan 2025 – tablet mockup of the report cover design featuring green icons representing sustainability themes such as trees, recycling, wind power and carbon reduction.
Naperville 2030 Carbon Action Plan 2025 – tablet mockup of a double-page introduction spread featuring school photography and illustrated icons, outlining the district’s climate goals and commitments.
Naperville 2030 Carbon Action Plan 2025 – tablet mockup showing two inside pages presenting the greenhouse gas inventory with data visualisations, sector breakdowns and student photography.
Tablet mockup showing the Waste section of the Naperville 2030 Carbon Action Plan 2025, featuring emissions targets, student photography, and a purple background with an icon overlay.
Tablet mockups of two inside pages from the Naperville 2030 Carbon Action Plan 2025, highlighting the greenhouse gas reduction target with supporting data visualisations and school building photography.
Tablet mockup showing the implementation timeline from the Naperville 2030 Carbon Action Plan 2025, outlining milestones and actions across four emission sectors on a light blue background
CRUM Trucking Sustainability Report 2023 cover design by Ethical Design Co., featuring a red truck and company headquarters.
Contents page of CRUM Trucking Sustainability Report 2023, outlining ESG topics, designed by Ethical Design Co.
About CRUM Trucking page from the 2023 Sustainability Report, highlighting company mission and logistics services, by Ethical Design Co.
essage from CRUM Trucking President Keith Crum, from the inaugural 2023 Sustainability Report, by Ethical Design Co.
Management, Governance, and Leadership page in CRUM Trucking's Sustainability Report 2023, featuring a graphical layout for visual clarity, by Ethical Design Co.
Our Sustainability Framework page in CRUM Trucking's 2023 Sustainability Report, outlining sustainability priorities and strategies, designed by Ethical Design Co.
Five inside pages from the City of Kent Climate Action Plan, featuring strategies for Electric Vehicle Infrastructure and Expanding Solar Energy, designed by Ethical Design Co.
Tablet displaying the City of Kent, Ohio's Climate Action Plan cover, a report developed by KERAMIDA and designed by Ethical Design Co. in PowerPoint.
Five inside pages from the City of Kent Climate Action Plan, showcasing the GHG Reduction Ordinance with a phased timeline and the Municipal Energy Management Plan, designed by Ethical Design Co.
Cover of Lamons Sustainability Report 2022, featuring a wind turbine and renewable energy imagery, designed by Ethical Design Co.
Inside page of Lamons Sustainability Report showcasing the company's vision, mission, and values with wind energy and solar panel imagery, designed by Ethical Design Co.
Multiple pages from the Lamons Sustainability Report 2022, highlighting sustainability strategies and renewable energy initiatives, designed by Ethical Design Co.

The brief

EDCo. has been collaborating with KERAMIDA under a white label arrangement designing various long-form corporate reports and documents for KERAMIDA’s clients. Some of the types of documents we have worked on include:

  • Sustainability reports
  • EH&S (Environmental, Health & Safety) reports
  • Climate Action Plans
  • Climate Scenario Analyses
  • Materiality Assessments
  • GHG (Greenhouse Gas) Emissions Inventories
  • InDesign and PowerPoint template documents for the above that can be used by KERAMIDA’s staff internally for future publications

Each report or document has been diligently researched, written and produced by KERAMIDA’s seasoned team of engineers, scientists and planners. Once the content is final, KERAMIDA hands over the files to EDCo. for design. The process is smooth and the results are consistently high-quality.

If you’re a sustainability consulting firm and would like to explore a similar arrangement, please feel free to:

start a chat with us

 

Cover of BOND Brothers 2024 Sustainability Progress Report, featuring night facility photo on tablet with a grey background, designed by EDCo.
BOND Brothers 2024 Sustainability Progress Report – sustainability strategy overview (ESG goals) on tablet with yellow background, designed by EDCo.
BOND Brothers 2024 Sustainability Progress Report – Environment progress matrix spread on an orange background, designed by EDCo.
BOND Brothers 2024 Sustainability Progress Report – emissions profile explainer (Scope 1–2) on tablet with orange background, designed by EDCo.
BOND Brothers 2024 Sustainability Progress Report – emissions intensity metrics summary page on tablet with a navy background, designed by EDCo.
BOND Brothers 2024 Sustainability Progress Report – emissions charts showing sources, intensity and fleet on tablet with grey background, designed by EDCo.
Cover of the BOND Brothers 2023 Sustainability Progress Report, featuring a portrait of a construction worker in safety gear, designed by Ethical Design Co.
Emissions profile trends page from the BOND Brothers 2023 Sustainability Report, displaying GHG emissions and equipment usage data through charts, designed by Ethical Design Co.
Biodiesel initiative highlight page from the BOND Brothers 2023 Sustainability Report, focusing on emissions reduction efforts through biodiesel integration, designed by Ethical Design Co.
Cover of the BOND Brothers Sustainability Progress Report 2022, featuring a modern building facade with an orange theme, designed by Ethical Design Co.
Inside page from the BOND Brothers Sustainability Report 2022, highlighting BOND's commitment to sustainability with images and text, designed by Ethical Design Co.
Environmental strategies inside page from the BOND Brothers Sustainability Report 2022, showcasing sustainability initiatives and renewable energy visuals, designed by Ethical Design Co.

How is this ethical?

KERAMIDA is committed to driving positive environmental and social impact, aligning its expertise with the evolving needs of industries in the pursuit of a more sustainable and resilient future. With a focus on technical expertise, innovation and client collaboration, KERAMIDA continues to be a trusted partner for companies seeking strategic environmental and sustainability solutions tailored to their unique challenges and goals.

EDCo. is a proud collaborator of KERAMIDA. As a sustainable graphic design agency, we actively support the firm’s mission and values, contributing our design expertise to enhance KERAMIDA’s (and their clients’) environmental and sustainability efforts.

Our annual donation of trees has been carefully calculated to offset all KERAMIDA projects.

Case studies

  • Stacked Landcare Victoria Inc. Annual Report covers from 2022–2025 Landcare Victoria Inc.
  • Brotherhood of St. Laurence (BSL) 2023 Annual Report website home page - Full colour mockup on a light grey background, displayed on a laptop. Brotherhood of St. Laurence
  • Selected pages from Fairground’s mini style guide, displaying the brand’s logomark, colour palette, brand typefaces and typography rules on a deep teal background. Fairground
  • Colour mockup Atticus Medical's redesigned homepage by EDCo., showcasing 'Medicines for good' and 'Therapeutic focus' sections for equitable healthcare. Atticus Medical
  • Medicines Development for Global Health featured image showing website homepage on multiple devices Medicines Development for Global Health
  • EnergyHub HubSummit 2024 factoid posters mockup depicted in a real-life setting with posters on a cement wall. EnergyHub

Browse all case studies

Get in touch or request a quote

Please contact us here and we'll get back to you within 48 hours.

Contact Us

  • This field is for validation purposes and should be left unchanged.
  • Max. file size: 2 MB.

Footer

Navigation

  • Green printing
  • Website design brief
  • Green design resources
  • Sustainable design course

Contact

Send us a message above or email our project manager at caitlin@ethicaldesign.co

EDCo. is based in Australia, but works with clients all over the world.

 

Follow us

  • Facebook
  • Instagram
  • LinkedIn

EDCo. acknowledges the Wurundjeri and Bunurong people of the Kulin Nation as the Traditional Owners and Custodians of the land on which we operate, where sovereignty was never ceded. We pay our respects to all First Nations people and acknowledge Elders past, present and emerging.

Sitemap · Copyright Ethical Design Co. © 2026 · This website is powered by 100% renewable energy.